Main project features:
Run-of-river HPP composed by: intake structure with rubber dam, steel penstock (DN 1600, L=450m), pressure tunnel (DN2400, L=5200m), design discharge 6m3/s, gross head 303,5m, n.2 vertical turbines Pelton type, Power 14,6 MW
Positions held: Designer