Skip to content

FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

CustomerJSC GEDF (former JSC GGEDC) - Georgia

ActivitesFeasibility Study, ESIA, FEED Design

Date2011 - 2013

LocationGeorgia

Brief

Name of assignment or project:

FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

Year:   2011 – 2013

Location: Georgia

Client:  JSC GEDF (former JSC GGEDC) – Georgia

Main project features:

Feasibility Studies, ESIA & FEED for 12 HPPs in 3 cascades

Positions held:  Designer

Activities performed:   Feasibility Study, ESIA, FEED Design

 

BLOCK 1 – TSABLARI CASCADE:

FS:
TSABLARI-1 HPP                  (7 MW)      12,5M USD 
TSABLARI-2 HPP                (12 MW)      17,7M USD
TSABLARI-3 HPP                  (4 MW)      18,4M USD
KAHN-TSABLARI HPP      (2,5 MW)      18,5M USD

FEED & ESIA :
TSABLARI-2#6 HPP      (17,46 MW)      19,6M USD

BLOCK 2 – QVIRILA CASCADE:

FS:
QVIRILA HPP             (7 MW)              14,8M USD 
SUSHA HPP            (0,2 MW)                 2,5M USD

 

BLOCK 3 – TEKHURI CASCADE:

FS:
TEKHURI-1 HPP          (3 MW)             11,3M USD 
TEKHURI -2 HPP          (3 MW)              9,7M USD 
TEKHURI -3 HPP          (3 MW)            11,4M USD 
TEKHURI -4 HPP    (2,75 MW)            12,5M  USD 
TEKHURI -5 HPP       (2,5 MW)           12,3M  USD 
TEKHURI -6 HPP       (2,5 MW)            16,4M USD 

OTHER PROJECTS