SUPERVISION OF CIVIL WORKS TO BE IMPLEMENTED IN KAKHETI REGION UNDER REGIONAL DEVELOPMENT PROJECT P126033

Main project features:
– renovation of squares and roads with stone flooring, new lights and urban furnishings (benches, bollards, bicycle car-rier, notice boards and dustbins)
– new pedestrian zones and parking
– restructuring of existing concrete walls by walls vertical covering with local materials
Positions held:
– Team Leader / Project Manager until 2014
– Key Expert – Civil Engineer since 2014 until completion
Activities performed:
Project Planning and Operations on site, Completion

Continue reading

FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

CustomerJSC GEDF (former JSC GGEDC) - Georgia

ActivitesFeasibility Study, ESIA, FEED Design

Date2011 - 2013

LocationGeorgia

Brief

Name of assignment or project:

FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

Year:   2011 – 2013

Location: Georgia

Client:  JSC GEDF (former JSC GGEDC) – Georgia

Main project features:

Feasibility Studies, ESIA & FEED for 12 HPPs in 3 cascades

Positions held:  Designer

Activities performed:   Feasibility Study, ESIA, FEED Design

 

BLOCK 1 – TSABLARI CASCADE:

FS:
TSABLARI-1 HPP                  (7 MW)      12,5M USD 
TSABLARI-2 HPP                (12 MW)      17,7M USD
TSABLARI-3 HPP                  (4 MW)      18,4M USD
KAHN-TSABLARI HPP      (2,5 MW)      18,5M USD

FEED & ESIA :
TSABLARI-2#6 HPP      (17,46 MW)      19,6M USD

BLOCK 2 – QVIRILA CASCADE:

FS:
QVIRILA HPP             (7 MW)              14,8M USD 
SUSHA HPP            (0,2 MW)                 2,5M USD

 

BLOCK 3 – TEKHURI CASCADE:

FS:
TEKHURI-1 HPP          (3 MW)             11,3M USD 
TEKHURI -2 HPP          (3 MW)              9,7M USD 
TEKHURI -3 HPP          (3 MW)            11,4M USD 
TEKHURI -4 HPP    (2,75 MW)            12,5M  USD 
TEKHURI -5 HPP       (2,5 MW)           12,3M  USD 
TEKHURI -6 HPP       (2,5 MW)            16,4M USD 

OTHER PROJECTS

GENERAL CONSULTANCY IN RENEWABLE ENERGY PLANTS

GENERAL CONSULTANCY IN RENEWABLE ENERGY PLANTS

CustomerCoop. Cellini – Prato (Italy)

ActivitesScouting, Pre-Feasibility Study, Surveys and data acquire-ment, Feasibility Studies, Due Diligences

Date2011 - 2012

LocationVarious sites

Brief

Main project features:

– No. 6 Feasibility Studies  of Photovoltaic Plants

– No. 2 Analysis of Biomass Plant

– No. 8 Due Diligences for HPPs:

PRALUNGO I, II & III HPP – Pralungo (BI) Italy   (350 kW)

ERNO-LESA HPP – Gignese (VB) Italy   (780,56 kW)

OTRO HPP – Alagna (VB) Italy  (3,3 MW) 

ORESKHE HPP – Kukes (Albania)  (5,6MW)

 

– No. 5 Pre-Feasibility for Mini/Micro HPPs:

CARELLO I HPP – Locana (TO) Italy   (5 kW) 

CARELLO II HPP – Locana (TO) Italy   (22 kW) 

CIAMOSSERETTO HPP – Noasca (TO) Italy  (n.a.  kW)

CERESOLE I HPP – Ceresole Reale (TO) Italy (100 kW)

CERESOLE II HPP – Ceresole Reale (TO) Italy  (100 kW)

Positions held: Consultant

OTHER PROJECTS

FRONT-END ENGINEERING DESIGN OF “TSABLARI #2” HPP ON “TSABLARASTSKALI” RIVER

FRONT-END ENGINEERING DESIGN OF “TSABLARI #2” HPP ON “TSABLARASTSKALI” RIVER

CustomerJDS GEDF – Tbilisi (Georgia)

ActivitesSite surveys, FEED and ESIA

Date2012

LocationGeorgia

Brief

Main project features:

Run-of-river HPP composed by: intake structure with rubber dam, steel penstock (DN 1600, L=450m), pressure tunnel (DN2400, L=5200m), design discharge 6m3/s, gross head 303,5m, n.2 vertical turbines Pelton type, Power 14,6 MW

Positions held:  Designer

OTHER PROJECTS

FEASIBILITY STUDY FOR 100MW PHOTOVOLTAIC FARM IN UKRAINE

FEASIBILITY STUDY FOR 100MW PHOTOVOLTAIC FARM IN UKRAINE

CustomerITALIAN DESIGN LTD (Georgia)

ActivitesFeasibility Study

Date2017

LocationUkraine

Brief

Main project features:

Feasibility Study of new photovoltaic ground plant

Positions held:  Designer

OTHER PROJECTS

REMOTE POWER UNIT

REMOTE POWER UNIT

CustomerTECSOLIS srl (Italy) for ITALIAN DESIGN LTD (Georgia)

ActivitesStudy of TOR and Technical & Financial proposal prepara-tion

Date2017

LocationAfrican Developing Country

Brief

Main project features:

Project of off grid photovoltaic plant with storage

Positions held:  Consultant

OTHER PROJECTS

CHIRUKHI & SANALYA HPPs

NEW AAA S.A. HEAD OFFICE

NEW AAA S.A. HEAD OFFICE

CustomerAAA – Advanced Accelerator Applications s.a

ActivitesOutline Design, Scheme Design, Detail Design, Project Planning and Operations on site, Completion

Date2011 - 2013

LocationSaint Genis Puilly France

Brief

Main project features:

The project foresees the creation of directional office building for 60 people. The building consists of 2 floors. The design adopts the most recent environmental friendly and energy efficiency principles. The anti-seismic structure is steel made. The project take also care of landscaping issues, parking and green areas.

Positions held:

– Structural Designer

– MEP Designer 

OTHER PROJECTS

NEW MOI ECOBUILDING AND LABORATORY FACILITIES IN ALBION

NEW MOI ECOBUILDING AND LABORATORY FACILITIES IN ALBION

CustomerMauritius Oceanography Institute

ActivitesFeasibility Study, Outline Design, Scheme Design, Detail Design, Tender Documentation, Project Planning and Op-erations on site, Completion

Date2012 - ongoing

LocationALBION - Mauritius

Brief

Main project features:

– Architectural Design

– Landscape Design & landscape marks conservation

– Environmental efficiency & sustainable urban development

– Advanced Ventilation Technologies

– Low Energy Cooling Building

Positions held:

– Renewable Energy Design

– Supervision

OTHER PROJECTS

BIOXPARC MODULAR CLINICS