FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

CustomerJSC GEDF (former JSC GGEDC) - Georgia

ActivitesFeasibility Study, ESIA, FEED Design

Date2011 - 2013

LocationGeorgia

Brief

Name of assignment or project:

FEASIBILITY STUDY, ESIA AND DESIGN OF HPPS ON “TSABLARI” RIVER , “QVIRILA” RIVER and “TEKHURI” RIVER

Year:   2011 – 2013

Location: Georgia

Client:  JSC GEDF (former JSC GGEDC) – Georgia

Main project features:

Feasibility Studies, ESIA & FEED for 12 HPPs in 3 cascades

Positions held:  Designer

Activities performed:   Feasibility Study, ESIA, FEED Design

 

BLOCK 1 – TSABLARI CASCADE:

FS:
TSABLARI-1 HPP                  (7 MW)      12,5M USD 
TSABLARI-2 HPP                (12 MW)      17,7M USD
TSABLARI-3 HPP                  (4 MW)      18,4M USD
KAHN-TSABLARI HPP      (2,5 MW)      18,5M USD

FEED & ESIA :
TSABLARI-2#6 HPP      (17,46 MW)      19,6M USD

BLOCK 2 – QVIRILA CASCADE:

FS:
QVIRILA HPP             (7 MW)              14,8M USD 
SUSHA HPP            (0,2 MW)                 2,5M USD

 

BLOCK 3 – TEKHURI CASCADE:

FS:
TEKHURI-1 HPP          (3 MW)             11,3M USD 
TEKHURI -2 HPP          (3 MW)              9,7M USD 
TEKHURI -3 HPP          (3 MW)            11,4M USD 
TEKHURI -4 HPP    (2,75 MW)            12,5M  USD 
TEKHURI -5 HPP       (2,5 MW)           12,3M  USD 
TEKHURI -6 HPP       (2,5 MW)            16,4M USD 

OTHER PROJECTS

GENERAL CONSULTANCY IN RENEWABLE ENERGY PLANTS

GENERAL CONSULTANCY IN RENEWABLE ENERGY PLANTS

CustomerCoop. Cellini – Prato (Italy)

ActivitesScouting, Pre-Feasibility Study, Surveys and data acquire-ment, Feasibility Studies, Due Diligences

Date2011 - 2012

LocationVarious sites

Brief

Main project features:

– No. 6 Feasibility Studies  of Photovoltaic Plants

– No. 2 Analysis of Biomass Plant

– No. 8 Due Diligences for HPPs:

PRALUNGO I, II & III HPP – Pralungo (BI) Italy   (350 kW)

ERNO-LESA HPP – Gignese (VB) Italy   (780,56 kW)

OTRO HPP – Alagna (VB) Italy  (3,3 MW) 

ORESKHE HPP – Kukes (Albania)  (5,6MW)

 

– No. 5 Pre-Feasibility for Mini/Micro HPPs:

CARELLO I HPP – Locana (TO) Italy   (5 kW) 

CARELLO II HPP – Locana (TO) Italy   (22 kW) 

CIAMOSSERETTO HPP – Noasca (TO) Italy  (n.a.  kW)

CERESOLE I HPP – Ceresole Reale (TO) Italy (100 kW)

CERESOLE II HPP – Ceresole Reale (TO) Italy  (100 kW)

Positions held: Consultant

OTHER PROJECTS

FRONT-END ENGINEERING DESIGN OF “TSABLARI #2” HPP ON “TSABLARASTSKALI” RIVER

FRONT-END ENGINEERING DESIGN OF “TSABLARI #2” HPP ON “TSABLARASTSKALI” RIVER

CustomerJDS GEDF – Tbilisi (Georgia)

ActivitesSite surveys, FEED and ESIA

Date2012

LocationGeorgia

Brief

Main project features:

Run-of-river HPP composed by: intake structure with rubber dam, steel penstock (DN 1600, L=450m), pressure tunnel (DN2400, L=5200m), design discharge 6m3/s, gross head 303,5m, n.2 vertical turbines Pelton type, Power 14,6 MW

Positions held:  Designer

OTHER PROJECTS

FEASIBILITY STUDY FOR 100MW PHOTOVOLTAIC FARM IN UKRAINE

FEASIBILITY STUDY FOR 100MW PHOTOVOLTAIC FARM IN UKRAINE

CustomerITALIAN DESIGN LTD (Georgia)

ActivitesFeasibility Study

Date2017

LocationUkraine

Brief

Main project features:

Feasibility Study of new photovoltaic ground plant

Positions held:  Designer

OTHER PROJECTS

REMOTE POWER UNIT

REMOTE POWER UNIT

CustomerTECSOLIS srl (Italy) for ITALIAN DESIGN LTD (Georgia)

ActivitesStudy of TOR and Technical & Financial proposal prepara-tion

Date2017

LocationAfrican Developing Country

Brief

Main project features:

Project of off grid photovoltaic plant with storage

Positions held:  Consultant

OTHER PROJECTS

CHIRUKHI & SANALYA HPPs

CHIRRE, PICHICIRRE & ISLA CASCADE HPPs