Skip to content

FRONT-END ENGINEERING DESIGN OF “TSABLARI #2” HPP ON “TSABLARASTSKALI” RIVER

CustomerJDS GEDF – Tbilisi (Georgia)

ActivitesSite surveys, FEED and ESIA

Date2012

LocationGeorgia

Brief

Main project features:

Run-of-river HPP composed by: intake structure with rubber dam, steel penstock (DN 1600, L=450m), pressure tunnel (DN2400, L=5200m), design discharge 6m3/s, gross head 303,5m, n.2 vertical turbines Pelton type, Power 14,6 MW

Positions held:  Designer

OTHER PROJECTS